Our Track Record
Our track record features projects in; Procurement, Fabrication and Installation of Manifold Skid Extension. Here are some of our major projects:
S/No. | Project Title | Status | Year | Clients |
---|---|---|---|---|
1 | Construction of FRM Bridge at OML 30 | Ongoing | 2021 | Heritage Energy Operational Services |
2 | Replacement of Sapele Well-24T Flowlines, Salvaging and Piping Modification | Ongoing | 2021 | SEPLAT |
3 | Provision of Bolt Torquing, Tensioning and Flang Management Services for Akpo | Ongoing | 2021 | TOTAL Plc |
4 | Conversion of HP-2 Separator to Test Separator 2 Installation of Meters | Completed | 2021 | SEPLAT |
5 | Procurement of Element Filter and Swagelok Tube Fittings | Ongoing | 2020 | TOTAL |
6 | Construction of Sapele Well-28T Flowlines | Completed | 2020 | SEPLAT |
7 | Construction of Sapele Well BGHC-02 Flowlines and Piping Modification Works | Completed | 2020 | SEPLAT |
8 | Procurement of Castel Pressure Safety Valves | Completed | 2020 | TOTAL |
9 | Supply of Materials for Fabrication on ERHA FPSO (Air Manifold) | Completed | 2020 | Exxon Mobil |
10 | Supply and Installation of Flanges for EHRA | Completed | 2020 | Exxon Mobil |
11 | Fabrication of Pipes on EHRA FPSO | Completed | 2020 | Exxon Mobil |
12 | Export Pumps Piping Vibration Reduction Services | Completed | 2020 | Enageed Resources Ltd. (SAHARA) |
13 | Construction of Ovhor MFD-Sapele 4" SCH 40 Tesline | Completed | 2019 | SEPLAT |
14 | Procurement of Compensation Rings | Completed | 2019 | Exxon Mobil |
15 | Procurement of Gaskets, StudBolts & Nuts for UBIT PP Restoration Project | Completed | 2019 | Exxon Mobil |
16 | Procurement and Delivery of Valves for UBIT PP Restoration Project | Completed | 2019 | Exxon Mobil |
17 | Replacement of Sapele Well-12 Dual Flowlines | Completed | 2018 | SEPLAT |
18 | Procurement of Materials for Oza EPF Interconnection Work | Completed | 2018 | Millennium Oil & Gas Company Ltd |
19 | Procurement of 6 X 12M Self Floating Hose | Completed | 2016 | LEKOIL |
20 | Engineering, Procurement, Construction and Installation of Produced Water Handling Facility | Completed | 2016 | LEE Engineering and Construction |
21 | Provision of Complete 5KV Solar Unit to Power CP System at Okporuru Gas Station | Completed | 2014 | SEPLAT |
22 | Okporuru Inlet Manifold Skid Extension Project | Completed | 2014 | SEPLAT |
23 | Procurement and Construction of 6" SCH 40 3PLE Flowline for Orogho-Okporuru Bulkline | Completed | 2014 | SEPLAT |
24 | Supply of Bulk Materials for Gas Flowline and WellHead Hookup (3+1 Wells) | Completed | 2014 | SEPLAT |
25 | Supply and Installation of Water Bath Heater including Construction of Foundation | Completed | 2013 | LEE Engineering and Construction |
26 | Supply and Installation of 10 Pieces of 8" MOV & 6 Units LPG Tanks/Strainers | Completed | 2012 | LEE Engineering and Construction |
27 | Supply and Installation of 8" MOV & 4 Units LPG Tanks/Strainers | Completed | 2012 | LEE Engineering and Construction |
28 | Design, Procurement, Construction & Installation of Fire Hydrant System | Completed | 2011 | LEE Engineering and Construction |